Jacking Trial

Several days after finishing the Cantilever Weighing, Cantilever & Drill floor Load Test, today is such a big day to all of PV’s staffs and workers because of our successfulness in finishing the Jacking Trial of the 90 meter Jack-up Unit, and The Tam Dao 3 was being jacked up in perfect condition even at its highest position (Tam Dao 3) with witnesses of PetroVietnam‘s President & CEO Mr. Đỗ Văn Hậu and Member of Board of Directors Mr. Nguyễn Xuân Thắng. This event is one of the 5 main events (including Cantilever Weighing, Cantilever & Drill floor Load Test, Lightship Weight Survey Procedure and Inclination Test) of PV Shipyard’s preparation in order to deliver Tam Dao 3 to the client.

After 23 months of hard working with all of our efforts, abilities and ambitions, up to this moment, we have completed 98% of the work and are going to deliver Tam Dao 3 to our client at the end of March 2012. As we all know that Tam Dao 3 is the 1stcomplex offshore drilling structure which is built by a Vietnamese Company and because of this, with the enormous challenge and under a very high pressure to all of PV Shipyard staffs and workers but together with our solidarity, bravery and decisive spirit, we have made it happens.

With this succeed, PV Shipyard affirms that we are confident to continue the next projects with our commitment as we shall only produce the same or better the quality of our products and services to our clients.