Completed Projects

On 12 August 2016, Russia-Vietnam Joint Venture - Vietsovpetro (Vietsovpetro) as owner and PetroVietnam Marine Shipyard (PV Shipyard) as the builder held handover ceremony for the Tam Dao 05 jack up rig after 32 months of construction.

Tam Dao 05 is a jack-up rig, designed in accordance with Friede and Goldman’s JU-2000E model. It is expected to have a total 18,000 tonnage when it is built, capable of operating at a depth of 120 meters or 400 ft below water, and will be able to drill at a depth of 9,000 meters, or 30,000 ft. This is the second jack-up rig domestically manufactured by subsidiaries of PetroVietnam. The first was Tam Dao 03 which was put into operation in 2012.

Based on the basic design of LTI 116E from LeTourneau Technologies Inc., PV Shipyard successfully completed building the first Jackup rig in Vietnam for National Oil & Gas Goup (PetroVietnam). The rig was delivered 2 months ahead in March 2012.

Technical information for our first Jackup rig: Super 116 E Class Overview

 PV Shipyard completed the services contract for “NAGA 3” jack up rig
 The strike steel ceremony for new-build project - 'Tam Dao 05' jack-up rig
 PetroVietnam Marine Shipyard - The "Vietship 2014" Diamond Sponsor
 Repair services of Murmanskaya Jack-Up Rig for Russian Client
 PV Shipyard – A proven track record ensures rig repair projects for Seadrill Management (S) Pte Ltd.
 Thriving Completion of “Liftboat H7060A Leg joining and installation” Project
 Successful completion of leg installation project for “Lewek Lifter” Liftboat